Pressure Equipment

Pressure Equipment Directive (97/23 / EC)
Scope:

MODULE B1 – EC Design Review
MODULE D and MODULE D1 – Production Quality Assurance
MODULE E and MODULE E1 – Product Quality Assurance
MODULE H – Full Quality Assurance
MODULE H1 – Full Quality Assurance With Special Review Of Design Review And Final Evaluation.
APPENDIX 1 Article 3.1.2 Approval of Fixed Connection Operations
Appendix 1 Article 3.1.3 Approval of Staff with Fixed Connection
APPENDIX 1 Article 3.1.3 Approval of Personnel Performing Non-Destructive Testing
CE Mark Conformity Assessment Procedures on Pressure Equipment:

Application is made by sending the documents listed below to our Institute. If there is no deficiency in the documents after the application documents are examined, the dates of the examination are determined and an examination takes place by reaching an agreement with the applicant company within the following week. The company is entitled to receive a document if any non-compliance is detected after the review is completed. Certification processes are completed in about 1 week in case of lack or incompliance. The companies are obliged to notify the important changes they have made to their systems to the TSE with the “Technical File Change Notification Form”.